Hi,
I want to plan data in 13 periods but i want to update that data into 12 periods in ECC is it possible in SAP BW IP. Thanks in advance
Hi,
I want to plan data in 13 periods but i want to update that data into 12 periods in ECC is it possible in SAP BW IP. Thanks in advance