Raise a warning in a BW-IP planning function of type Exit
Hi there, does anybody know how to raise a warning in a BW-IP planning function of type Exit? I tried MESSAGE w001(zbw_message) INTO l_dummy. i_r_msg->add_msg( ). but that doesn't have any...
View ArticleData load issue in SAP BPC 10.1 Embedded
Hi Experts, We have data in ECC with 100 client and loaded to S/4 HANA DB 100 client. The issue is to load data into BW (having client 200) from ECC client 100. Any integration tool or program is their...
View ArticleInvalid char comb CHECK (exit) saved to DB
We have implemented IF_RSPLS_CR_METHODS~CHECK and it seems to be working fine, but strangely enough those combinations where the logic concludes: e_is_valid = rs_c_false. ...l_s_mesg-msgty =...
View ArticleCustomer exit on fisacl period working in Quality but same code giving error...
Hi Guys,There is a customer exit for Fiscal Period and when i execute the Planning Sequence, it gives the error that Value "2014004" for user-exit variable is invalid. The same code works fine in...
View ArticlePlanning workbook in Analysis
Hello All, I'm trying to create a Integrated Planning workbook using Analysis for Office. I have gone through thishttp://scn.sap.com/docs/DOC-16319 document and I get this error when I try to add...
View ArticleMissing data when try to load from Transactional Cube
Hi to all,I built an integrated planning flow for inventory.This flow is composed by:first level Transactional Cubeit is the cube where the users write the inventory information using a workbook.Data...
View ArticleHow to set BI-IP / BEX variables dynamically
Hi Experts I have to call my BI-IP planning sequence from ABAP program, I will use for this purpose standard program RSPLS_PLSEQ_EXECUTE. The only problem is that I have to pass every time new...
View ArticleBPC Problem
Hi, all. We have BPC 10.1 Embedded. We want to create report by BPF proccess, but faced with problem.We create report on view RSBPCB_REPORT that joined with table RSBPCC_FEED_COM by field FEED_ID.By...
View ArticleError RSPLS_CR 027 in char comb CHECK & CREATE
We have the following 4 characteristics in a query for which the user creates new combinations: - Account (restricted to 500 entries in the filter and does not include '#')- Customer (unrestricted in...
View ArticleIF_RSPLS_DS_METHODS~IS_PROTECTED & IS_OVERLAPPING not called
When testing an exit-based DS (Z-class inheriting from CL_RSPLS_DS_EXIT_BASE) with an input ready query (which works and display some previously saved data) in RSRT the following methods are called:...
View ArticleHow to monitor Planning Functions / Planning Sequences in SAP BW.
Hi, Can you please let me know if there is a way by which I can monitor the execution of a planning Function (Copy, Repost, etc.) in SAP BW. I have checked and no job is getting generated in SM37 for...
View ArticleCreate work status report in BPC embedded planning
Hi All, I am working on BPC Embedded planning for BW 7.4 SP14, and Analysis Office (AO) 2.3. I'd like to develop the Work status report in Analysis Office (we don't use standard work status report in...
View ArticleUpdate table via AMDP exit planning functions ?
Hi All - I am working on BPC 10.1 embedded planning, and I have exit AMDP planning function to calculate. I found that AMDP planning function failed due I have Data Slice type exit protecting the...
View Articlewrong KF values in query when planning in DSO
Dear all, I am planning an integer key figure in DSO.My data model is DSO - Multi Provider - Aggregation Level - Query.I want to plan the value only as 0 and 1.In my DSO I also only have value 0 and...
View ArticlePE Error 38.001 if running planning functions?
Hello All - I am working on AO 2.3 and BW 7.5 SP02 embedded planning. I keep failing to execute Planning functions both FOX and Exit SQL. I encountered error as attached below the error message....
View ArticleData Locking with DataSlice on MultiProvider
Hello Everyone, Data Slice locking is not working on Multiprovider. We had created a report on aggregation level of Multiprovider. We have created Z of standard Data slice to work on...
View ArticleDifference between Embedded planning and Integrated Business Planning for...
Hello, can anybody please explain to me the difference between Embedded planning and Integrated Business Planning for finance? I am totally confused. Can BI-IP still be used in Integrated Business...
View ArticlePlanning Functions fails due of data slice (no PE Error Text).
Hi All - I am working on BW 7.5 SP02, and AO 2.3. I have FOX, and EXIT AMDP planning function, and data slice. If data slice is active, I encountered an error if I run planning function for...
View ArticleData Slice for combination of Values
Hi Experts, We use BW IP and we have an Input Ready Query. We have Positing Periods along columns and Product, Customer and Company Code along rows. Posting Periods have restricted key figure. Now when...
View ArticleInsert calculated records in BW IP
Hi Experts, We have a scenario in BW IP based on below image. Section A is an input ready query. The posting periods are restricted to 0AMOUNT. A1 to A5 are Accounts.User will enter data for all...
View Article